Since our inception it has always been our endeavour to incorporate proper practices, suitable products and latest technology in order to maximize efficiency of our rainwater harvesting systems.
Below described is how our systems are better than others in terms of various parameters :
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Random decision of depth and slotted portion |
Our efficient practice(s) Geophysical study & Groundwater Level Measurement |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) No attention paid |
Our efficient practice(s) Recharge test done in existing borewell |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) PVC SWR Non-ISI pipes are used as casing |
Our efficient practice(s) PVC Pressure pipes conforming to ISI and atleast 6kgf/cm2 rating are used as casing |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Casing pipes have round holes or are manually- slotted parallel to length, with no particular attention to slot width, length, arrangement and distance between slots |
Our efficient practice(s) Casing pipes are company slotted and transverse to length with adherence to parameters as per IS:12818-2010 and IS:4985-2000 |
|
![]() |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Ordinary crusher gravel with pointed ends or ungraded & unwashed river gravel with organic impurities is used as gravel pack in recharge bore well |
Our efficient practice(s) Rounded or sub-rounded, graded and washed silica gravel of standard size (3-6mm) is used as gravel pack in recharge bore well |
![]() ![]() |
![]() |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Due emphasis not given on development of recharge bore well before final commissioning of rainwater harvesting system |
Our efficient practice(s) Development of recharge bore well by bailing machine is done before final commissioning of rainwater harvesting system |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Portion of casing pipe in recharge pit is manually- slotted parallel to length to allow entry of rainwater into recharge bore well |
Our efficient practice(s) V-Wire Screen is fitted with portion of casing pipe in recharge pit to allow entry of rainwater into recharge bore well |
|
![]() |
Drawbacks
|
Benefits
|
Other agencies, plumbers & civil contractors | VenturEnv |
---|---|
General practice(s) Not enough attention is paid on providing ventilation in rainwater harvesting structures |
Our efficient practice(s) Proper ventilation of filter pit, recharge pit and recharge bore well is done by making provision for air pipes |
Drawbacks
|
Benefits
|